Date the check was completed

Variable Description

Name
moh_bsc_check_date en-NZ
Label
Date the check was completed en-NZ
Description

The date the check was first completed or closed. The B4 School Check year runs to the 7th of the month to allow DHBs to submit their paperwork. Children with check_date completed up to a week after the end of December will have had their checks completed by the end of December.

en-NZ
This variable is not part of a dataset.

Representation

Representation Type
Date/Time
Type
Day
Aggregation Method
Unspecified
Temporal
False
Geographic
False

Concept

Conceptual Variable
conceptual-variable-16.png Health en-NZ
Concept
concept-16.png Health en-NZ

Appears Within

Information

History

View Full History
Revision Date Responsibility Rationale
4 22/12/2021 11:36:38 AM
3 30/11/2021 4:06:13 PM