Series
Value of Building Work Put in Place
en-NZQuarterly Building Activity Survey
en-NZStatistics New Zealand
en-NZThe Value of Building Work Put In Place has been conducted since 1965. It was introduced to supplement building consent statistics as an economic indicator. Information for the series is obtained from building consents and from a postal survey called the Quarterly Building Activity Survey (QBAS). Building consents are the sample frame for QBAS - see Building Consents Issued
Whereas the monthly Building Consents Issued series is an early economic indicator of the intention to build, the Value of Building Work Put in Place series is designed to measure the actual value of work done each quarter on buildings.
en-NZThe purpose of the quarterly Value of Building Work Put in Place is to provide an estimate of the value and volume of work put in place on construction jobs in New Zealand. The value of building work includes residential building work and non-residential building work, which are summed to give all building work. The Value of Building Work put in Place measures activity in the construction sector, and complements building consents issued information (which represents the intention to build).
en-NZCOVID-19 and the March 2020 quarter onwards
From the March 2020 quarter onwards we have applied model adjustments to account for the impacts of COVID-19 on building activity (such as building activity delayed due to alert level 4 lockdowns or supply constraints). These adjustments are revised from time to time as improved data becomes available. For information about the adjustment applied each quarter see the Methodology section below.
Quarterly survey collection mode change 2019
In the March 2019 quarter we introduced an online data collection, replacing paper questionnaires that had been administered by post for over 50 years.
Methodology change 2015
In the March 2015 quarter we introduced methodology based on modelled administrative data, supplemented by a postal survey, to estimate the value of building work put in place. This replaced a stratified sample survey that had been used for 50 years. For further information, see Data Collections/ Value of Building Work Put in Place from December 2014 quarter.
Constant price series
From the June 2006 quarter, the method for calculating the constant price series (ie the price deflated series) was updated to be based on September 1999 quarter prices.
Deflation of values 1998
Deflated values (volumes) for residential buildings, non-residential buildings and all buildings was implemented from the March 1998 quarter.
Building type change 1996
From the September 1996 quarter, consents received for Buildings with multiple purposes were split up and coded under more than one building type. Prior to this time the work was coded to Miscellaneous and Multipurpose.
Seasonal adjustment methodology change 1994
The seasonal adjustment methodology changed, when the figures for the December 1994 quarter were released, from fixed quarterly forward factors to concurrent seasonal adjustment. In addition, all seasonally adjusted figures are now subject to revision each quarter. This enables the seasonal component to be better estimated and removed from the series.
Building Consents
Under the building regulations effective from 1 January 1993, building authorisations are applied for under the Building Consents system administered by territorial authorities. Prior to this date, applications were made under the Building Permits system. The Building Consents system, however, has wider coverage than the Building Permits system. The additional coverage includes some government building (particularly work on education buildings) and on-site drainage and reticulation work.
Data is available from Infoshare under Industry sectors - Building Activity Survey - BAS
Usage
The quarterly Value of Building Work Put in Place statistical series is the best available measure of the value of building work done by the construction industry. Whereas the Building Consents Issued series measures the numbers, values and floor areas of consented building jobs, the work put in place series measures the actual value of the work done on the consented jobs.
Financial institutions, Reserve Bank, Treasury, economic forecasters, media
- Quarterly
Studies
Coverage
Current methodology - Value of Building Work Put in Place from December 2014 Quarter
The value of building work put in place measures activity in the construction sector, and complements building consents issued information (which represents the intention to build).
These quarterly releases provide estimates of the value and volume of work put in place on construction jobs in New Zealand. The value of building work includes residential building work and non-residential building work, which are summed to give all building work. Non-building construction work, such as roads and bridges, is excluded.
en-NZMethodology
Population frame
The population frame for value of building work put in place is a list of building consents issued by territorial authorities (TAs) throughout New Zealand. Each month, TAs provide us with new building consents they have issued. These details include the consent value, job description, contact details of owner and builder, and the building site address. Building consents valued under $5000 are excluded, as are consents for non-building construction.
Methodology from December 2014 quarter
We introduced a new methodology for estimating the value of building work put in place in the March 2015 quarter, and applied it from the December 2014 quarter. From a methodology based on a sample survey, it is now based on modelled administrative data supplemented by a sample survey.
Between 1965 and 2014, the value of building work put in place was estimated from a sample survey. During this time the sample design did not change significantly, although we kept the sample optimal.
See Methodology and classification changes to value of building work put in place statistics for more details about the changes.
Related information: Implementing classification and other changes to building consent statistics
COVID-19 from the March 2020 quarter onwards
The behaviour of modelled building projects changed due to COVID-19, so we have surveyed an additional sample of medium-value building projects since the beginning of the pandemic. We calculate model adjustments by comparing the results of this survey (with outliers removed) against our model’s predictions.
Model adjustments account for the impacts of COVID-19 on building activity. These adjustments are revised from time to time as improved information becomes available for previously non-responding building projects. Downward adjustments reflect building activity that was delayed or cancelled (for example due to alert level 4 lockdowns or supply constraints). Upward adjustments reflect a catch-up on delayed construction in later quarters.
The current adjustments are:
Quarter | Adjustment | Status |
---|---|---|
March 2020 | Down 8.2 percent (5 working days) | Final |
June 2020 | Down 21.7 percent | Final |
September 2020 to March 2021 | Up 3.5 percent | Final |
June 2021 | No adjustment | Final |
September 2021 | Down 10.3 percent | Final |
December 2021 | Down 10.1 percent | Final |
March 2022 | Down 9.4 percent | Final |
June 2022 | Down 8.0 percent | Final |
September 2022 | Up 4.0 percent | Final |
December 2022 | Down 0.6 percent | Final |
March 2023 | Down 3.6 percent | Final |
June 2023 | Up 3.6 percent (previously up 4.9 percent) | Final |
September 2023 | Up 15.3 percent (previously up 14.8 percent) | Provisional |
December 2023 | Up 16.1 percent (previously up 16.6 percent) | Provisional |
March 2024 | Up 10.8 percent | Provisional |
See Methodology for Value of building work put in place for more details about the changes.
Modelling methodology
The methodology aims to reduce the number of questionnaires sent to respondents by estimating the quarterly value of building work, based on the age and value of building consents. Large consented projects (new and ongoing) will continue to be surveyed each quarter for the duration of the building project.
Modelled and modelled low value
Building consents are modelled when the value is under the postal value cut-offs in the table below. Modelled low value consents are under the low value threshold.
Modelling has two main aspects:
- The building consent value is rated up to reflect that the value of work put in place typically exceeds the building consent value.
- The rated-up value of building work is apportioned across several quarters to reflect typical time taken to complete building projects.
The modelling equation is: quarterly value of work put in place = building consent value * rate-up factor * apportionment ratio
We apply different rate-up factors and apportionment ratios depending on the building type.
Modelled low-value consents are rated up but completed in one quarter, not apportioned across several quarters.
Modelling error
Estimates for the value of building work put in place are modelled for a portion of the population. Modelling errors measure the variability that occurs when we apply a statistical model to produce estimates, which quantifies the effect of model 'imperfections'. The relative modelling error is expressed as a percentage of the estimate at the 95 percent confidence interval limit.
Modelled rate
Modelled rate is the percentage of the estimated work put in place that we modelled for a building category.
Quarterly Building Activity Survey (QBAS)
The following table shows the building consent cut-off values for the survey components.
Value of building work - building consent value cut-offs for survey | ||
---|---|---|
Starting quarter | ||
March 2015 | $800,000 + | $1,800,000 + |
June 2016 | $900,000 + | $1,900,000 + |
December 2017 | $1,130,000 + | $1,900,000 + |
December 2018 | $1,180,000 + | $1,900,000 + |
December 2019 | $1,220,000 + | $1,900,000 + |
December 2020 | $1,250,000 + | $1,900,000 + |
December 2021 | $1,400,000 + | $1,900,000 + |
September 2022 | $2,400,000 + | $2,900,000 + |
While the majority of projects are modelled, projects with the highest consent value are all directly surveyed. All staged building consents are also surveyed.
September 2022 consent value threshold increase
We increased the consent value threshold by $1 million for the September 2022 quarter onwards for both residential and non-residential building projects.
This threshold adjustment was necessary to improve the sustainability of the survey. Since early 2021 the large volume of construction activity and higher building costs has increased the size of the survey to unsustainable levels. Analysis has shown that the threshold increase is unlikely to have a material impact on the statistics.
Changes in the December 2017 to 2021 quarters
We increased the residential building consent value cut-off for postal survey to from $900,000 to $1,130,000 in the December 2017 quarter, to $1,180,000 in the December 2018 quarter, to $1,220,000 in the December 2019 quarter, to $1,250,000 in the December 2020 quarter, and to $1,400,000 in the December 2021 quarter. We calculated new modelling parameters from completed projects to use for consents valued between $900,000 and the upper boundary. These higher value residential projects have a higher rate-up factor than most residential consents, and the apportionment ratio reflects that less of the building work is completed in the first three quarters than for lower value residential projects. The modelling parameters for residential consents valued under $900,000 were not changed.
There were no changes for non-residential buildings – the consent value cut-off remained $1,900,000 and the modelling parameters were unchanged.
We introduced the higher residential value modelled strata to reduce respondent burden, as the number of residential projects in the postal survey increased markedly in recent quarters. The higher survey count was due to both the large volume of construction activity being undertaken and higher building costs reflected in building consent values.
Non-response imputation
For building projects where no survey response is received, we impute values for work put in place, based on responses for comparable projects.
Imputation rate
Imputation rate is the percentage of the estimated quarterly work put in place that we imputed for a building category.
Quarterly quality measures
See Infoshare for building activity quality measures. (Industry sectors/ Building Activity Survey - BAS/ Building activity quality (Qrtly - Mar/Jun/Sep/Dec))
- Modelling error
- Modelled rate
- Imputed rate
- Sampling error (for data up to September 2014 quarter)
Note, rates tend to be lower for building categories and regions with the greatest number of units.
June 2023 quarter questionnaire changes
We made changes to the quarterly building activity survey (QBAS) from the June 2023 quarter onwards. The most significant change was to change the term “cost of work put in place” to “cost of work done” in the question “As at [quarter end date], what was the cost of work done so far on this job, excluding GST?” Other minor changes were made to the survey to improve the respondent experience.
A copy of the new questionnaire form can be found here.
Interpreting the data
Volumes (constant price series)
Current values include both a quantity and price component, whereas constant price series (volumes) have had the effect of price changes removed. Removal of price change (deflation) leaves just the volume (or quantity) component, enabling comparisons across different time periods without the distortion caused by price inflation (or deflation).
Quarterly values for residential building work and non-residential building work are separately deflated by the residential buildings and non-residential buildings sub-indexes from the capital goods price index (Included in Business Price Indexes.) The deflated quarterly values are expressed at a constant pricing level, using September 2022 quarter prices. Deflated values for all building activity are calculated as the sum of the deflated values for residential and non-residential building activity.
We deflate prices before seasonal adjustment and estimation of trend values.
December 2022 volume series rebase to September 2022 quarter prices
We rebased our volume measures of building work put in place to constant September 2022 quarter prices. Previously, they used September 1999 quarter prices. Historical data was updated to reflect this change.
For more information see Methodology for value of building work put in place: September 2022 quarter onwards.
June 2023 quarter change to seasonal adjustment methodology
We changed the seasonal adjustment methodology to remove the temporary split adjustment with the publication of Value of building work put in place: June 2023 quarter. This simplifies the seasonal adjustment methodology and will mean that seasonally adjusted series prior to December quarter 2014 will not be recalculated in future releases.
We also changed the seasonal adjustment methodology to automatically detect additive outliers for special treatment. This is a more systematic approach for seasonal adjustment that is being implemented across Stats NZ following the impact of COVID-19. This treatment will be applied from the March 2020 quarter onwards. As a result of this change trend series are now available.
Seasonal adjustment and automatic outliers in time series after COVID-19 describes this treatment.
We paused the seasonal adjustment of some regional series because they no longer meet quality requirements. These series were:
- Canterbury region non-residential buildings (BASQ.SA132000C1S)
- Wellington region all buildings (BASQ.SA090002C1S)
- Rest of North Island excluding Auckland, Waikato and Wellington regions all buildings (BASQ.SARN0002C1S).
These seasonally adjusted series may become available again at a future date if they meet quality requirements.
Methodology for value of building work put in place: June 2023 quarter has more information on these changes.
Seasonally adjusted series
Seasonal adjustment removes the estimated impact of regular seasonal events, such as summer holidays and pre-Christmas purchasing, from statistical series. The makes figures for adjacent periods more comparable.
We recalculate the seasonally adjusted series quarterly when each new quarter's data becomes available. Figures are therefore subject to revision, with the largest changes normally occurring in the latest quarters.
We use the X-13ARIMA-SEATS seasonal adjustment program, developed in the U.S, Census Bureau, to produce the seasonally adjusted and trend estimates.
See Seasonal adjustment in Statistics New Zealand for more information.
Trend series
Trend calculation removes the estimated impact of regular seasonal events and irregular short-term variation from statistical series. This reveals turning points and the underlying direction of movement over time.
We recalculate trend series quarterly when each new quarter's data becomes available. Figures are therefore subject to revision, with the largest changes normally occurring in the latest quarters. Revisions can be large if values are initially treated as outliers but are later found to be part of the underlying trend.
We use X-13ARIMA-SEATS seasonal adjustment program to produce the seasonally adjusted and trend estimates. Irregular short-term variation is removed by smoothing the seasonally adjusted series using optimal weighted moving averages.
Comparison with building consent statistics
Building consent statistics provide an indication of upcoming building activity, but comparisons may be affected by variable timing and valuation differences.
en-NZPrevious methodology- Value of Building Work Put in Place to September 2014 Quarter
This data collection content is regarding high level methodological information that will not change over the life of this series.
en-NZMethodology
Data source
Values for building work put in place are obtained each quarter by a postal survey of builders or consent applicants. The survey is based on building consents data and is called the Quarterly Building Activity Survey (QBAS).
en-NZThe Value of Building Work Put in Place statistical series began in 1965, and provides the quarterly estimated value of work put in place on buildings. Information for the series is obtained from building consents and from a postal survey called the Quarterly Building Activity Survey (QBAS). The monthly Building Consents Issued series is an early economic indicator of the intention to build, and the Value of Building Work Put in Place series estimates the actual value (and volume) of construction work done each quarter on buildings.
en-NZSurvey design
Building consents are grouped each month into four value ranges for residential buildings, and four value ranges for non-residential buildings, as follows:
- Highest-value range – for all residential or non-residential consents, builders or consent applicants are surveyed to obtain quarterly values for building work put in place.
- Second- and third-value ranges – a sample of builders or consent applicants is surveyed and the quarterly values collected are rated up, to represent both surveyed and non-surveyed building work.
- Lowest value range – the consent values are used to represent the quarterly value of building work put in place.
Value of building work strata boundaries from 2008 to 2014 - building consent value strata boundaries for postal survey | ||
---|---|---|
Starting quarter | Residential building consent value | Non-residential building consent value |
Postal survey - full coverage | $1,200,000 + | $1,600,000 + |
Postal survey - weighted | $310,000 < $1,200,000 | $420,000 < $1,600,000 |
Postal survey - weighted | $45,000 < $310,000 | $80,000 - $420,000 |
Modelled low value | $5,000 < $45,000 | $5,000 < $80,000 |
Full coverage strata 01 Residential and 05 Non-residential.
Weighted strata 02 & 03 Residential and 06 & 07 Non-residential.
Modelled low value 04 Residential and 08 Non-residential.
Surveyed building jobs that are not completed at the end of the quarter are surveyed again in following quarters until the work is finished.
The rating up of sampled values and calculation of sampling error are complex and depend on factors that differ for each value range and month of selection. For further information, contact info@stats.govt.nz.
Interpreting the data
Constant price series (volumes)
Current values include both a quantity and price component, whereas constant price series (volumes) have had the effect of price changes removed. Removal of price change (deflation) leaves just the volume (or quantity) component, enabling comparisons across different time periods without the distortion caused by price inflation (or deflation).
Quarterly values for residential building work and non-residential building work are separately deflated by the residential buildings and non-residential buildings sub-indexes from the capital goods price index. The deflated quarterly values are expressed at a constant pricing level, using September 1999 quarter prices. Deflated values for all building activity are calculated as the sum of the deflated values for residential and non-residential building activity.
Price deflation is done before seasonal adjustment and estimation of trend values.
Seasonally adjusted series
Seasonal adjustment removes the estimated impact of regular seasonal events, such as summer holidays and pre-Christmas purchasing, from statistical series. This makes figures for adjacent periods more comparable.
The seasonally adjusted series are recalculated quarterly when each new quarter’s data becomes available. Figures are therefore subject to revision, with the largest changes normally occurring in the latest quarters.
The X-13ARIMA-SEATS seasonal adjustment program, developed at the U.S. Census Bureau, is used to produce the seasonally adjusted and trend estimates.
Seasonal adjustment in Statistics New Zealand has more information.
Trend series
Trend calculation removes the estimated impact of regular seasonal events and irregular short-term variation from statistical series. This reveals turning points and the underlying direction of movement over time.
The trend series are recalculated quarterly when each new quarter’s data becomes available. Figures are therefore subject to revision, with the largest changes normally occurring in the latest quarters. Revisions can be large if values are initially treated as outliers but are later found to be part of the underlying trend.
The X-13ARIMA-SEATS seasonal adjustment program is used to produce the seasonally adjusted and trend estimates. Irregular short-term variation is removed by smoothing the seasonally adjusted series using optimal weighted moving averages.
Comparison with building consent statistics
Building consent statistics provide an indication of upcoming building activity, but comparisons may be affected by variable timing and valuation differences, particularly following the Canterbury earthquakes.
en-NZThe sample frame for the Value of Building Work put in Place is a list of building consents issued by Territorial Authorities (TAs) throughout New Zealand.
Each month, the TAs supply details of new building consents they have issued. These details include the value of the consent, the type of building, the owner/ builder contact details, the building site address etc. Consents worth less than $5000 are excluded. The sample frame excludes consents for building work that is classified as "Other construction " (non-building construction), such as retaining walls, swimming pools etc.
Sample selection
The QBAS is based on a stratified sample design. New building consents are split into two groups; residential and non-residential. Each of these groups is further divided into four value groups on the basis of consent value, making a total of eight strata or value groups in total, referred to as value groups 01 to 08.
The two value groups with the highest consent values - 01 for residential buildings and 05 for non-residential buildings - are full-coverage in the sample. All consents in these value groups are in QBAS. Strata 01 and 05 also include consents for multiple building types and staged consents.
The two values groups with the lowest consent values - 04 for residential buildings and 08 for non-residential buildings - are not sample. We assume that the work on these consents was started and completed within the same quarter that the consent was issued, and that the value of work put in place is the same as the consent value.
The remaining four value groups (02, 03, 06 and 07) are sampled. The sample is selected systematically (ie 1 in every nth consent is selected) from a list of consents ordered geographically within each value group. The geographic ordering ensures that the sample is allocated across geographic areas in proportion to the number of consents in the population in that area. Sample selection is independent within each value group and the sample size is fixed, that is the sampling fraction varies with the number of consents.
Estimated share of total work put in place by strata as at (date) 01 20% 05 25% 04 and 08 together 7%
Target sample sizes by strata as at (date) 02 52 03 117 06 19 07 22
en-NZ